ANALISA HARGA SATUAN PEKERJAAN ATAP
No
|
URAIAN
|
SATUAN
|
KOEF.
|
HARGA SATUAN (Rp)
|
SUB. JUMLAH (Rp)
|
JUMLAH
(Rp)
|
|
PEKERJAAN ATAP
|
|||||||
1.
|
1 m² Atap Kanopy Twinlight + Rangka Hollow
Bahan :
- Polycarbonat t 6 mm
- Sekroof
- Rangka hollow 40.40.1.6
- Kawat las
Tenaga Kerja :
- Pekerja
- Tukang Las
- Kepala Tukang
- Mandor
|
m2
bh
m1
kg
org/hr
org/hr
org/hr
org/hr
|
1.100
42
5
0.25
0.400 0.200
0.020
0.020
|
107,400
150
54,000
85,000
157,643
166,729
182,676
194,274
|
118,140
6,300
270,000
21,250
63,057 33,346
3,654
3,885
|
||
Jumlah Harga :
|
519,632.00
|
||||||
Keuntungan 10% :
|
|||||||
Jumlah Harga :
|
519,632.00
|
||||||
2.
|
1 m² Atap Kanopy Twinlight
Bahan :
- Polycarbonat t 6 mm
- Sekroof
Tenaga Kerja :
- Pekerja
- Tukang Las
- Kepala Tukang
- Mandor
|
m2
bh
org/hr
org/hr
org/hr
org/hr
|
1.100
42
0.400 0.200
0.020
0.020
|
107,400
150
157,643
166,729
182,676
194,274
|
118,140
6,300
63,057 33,346
3,654
3,885
|
||
Jumlah Harga :
|
228,382.00
|
||||||
Keuntungan 10% :
|
|||||||
Jumlah Harga :
|
228,382.00
|
||||||
3.
|
1 m² Pekerjaan Pemasangan
Atap Genteng Metal Roof Bepasir t : 0,3 mm
Bahan :
- Metal Roof
- Paku Biasa 2"
- 5"
Tenaga Kerja :
- Mandor
- Kepala Tukang
- Tukang
- Pekerja
|
Lb
kg
org/hr
org/hr
org/hr
org/hr
|
1.3875
0.2
0.010 0.010
0.100
0.200
|
90,000 21,000
194,274
182,676
166,729
157,643
|
124,875 4,200
194
1,827
16,673 31,529
|
||
Jumlah Harga :
|
179,297.53
|
||||||
Keuntungan 10% :
|
|||||||
Jumlah Harga :
|
179,297.53
|
||||||
4.
|
1 m1 Pekerjaan Pemasangan
Wuwung Nok Metal Roof Berpasir t: 0,3 mm Ex Sakura Roof
Bahan :
- Nok Metal
Roof
- Paku Biasa 2"
- 5"
Tenaga Kerja :
- Mandor
- Kepala Tukang
- Tukang
- Pekerja
|
Lb
kg
org/hr
org/hr
org/hr
org/hr
|
1.1
0.05
0.013 0.015
0.150 0.250
|
18,909 21,000
194,274
182,676
166,729
157,643
|
20,800 1,050
2,526
2,740 25,009 39,411
|
||
Jumlah Harga :
|
91,535.70
|
Keuntungan 10% :
Jumlah Harga :
91,535.70
5.
1 m² Pasang atap genteng
morando
Bahan :
- Genteng morando
Tenaga Kerja :
- Mandor
- Kepala Tukang
- Tukang
- Pekerja
bh
org/hr
org/hr
org/hr
org/hr
18
0.010 0.010
0.100
0.200
5,000
194,274
182,676
166,729
157,643
90,000
1,943
1,827
16,673 31,529
Jumlah Harga :
179,297.53
Keuntungan 10% :
Jumlah Harga :
179,297.53
6.
1 m1 Pasang genteng bubung
morando
Bahan :
- Bubungan Genteng
Glazur
- Semen portland
- Pasir pasang
Tenaga Kerja :
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
Bh
Zak
M3
org/hr
org/hr
org/hr
org/hr
4
0.16
0.032
0.400 0.200
0.020
0.002
12,300
50,000
265,000
157,643
166,729
182,676
194,274
49,200
8,000
8,480
63,057 33,346
3,654
389
Jumlah Harga :
166,125.07
Keuntungan 10% :
Jumlah Harga :
166,125.07
7.
1 m² Pasang Atap Genteng
Keramik Glazur Ex. Kanmuri
Bahan :
- Genteng Keramik
Glazur Ex. Kanmuri
- Paku Biasa 2" -
5"
Tenaga Kerja :
- Mandor
- Kepala Tukang
- Tukang
- Pekerja
bh
kg
org/hr
org/hr
org/hr
org/hr
14.5
0.03
0.010 0.010
0.100
0.200
14,000
21,000
194,274
182,676
166,729
157,643
203,000
630
1,943
1,827
16,673 31,529
Jumlah Harga :
255,601.00
Keuntungan 10% :
Jumlah Harga :
255,601.00
8.
1 m² Pasang Atap bitumen
selulosa uk. 95 x 200 cm
Bahan :
- Atap Bitumen
Selulosa uk. 95 x 200 mm
- Sekrup
Tenaga Kerja :
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
Lbr
bh
org/hr
org/hr
org/hr
org/hr
0.641
8
0.140 0.070
0.007
0.0007 |
175,000
250
157,643
166,729
182,676
194,274
112,175
2,000
22,070 11,671
1,279 136
136
Jumlah Harga :
149,330.77
Keuntungan 10% :
Jumlah Harga :
149,330.77